Base hole dug
This is the foundation for the Smartjack

Rebar added
This rebar will tie the concrete together and add support

Concrete base
The concrete is poured and allow to cure for 4 -5 days

post added
The post is added and the floor is restored.

post under beam
Hre the post is added under the main beam and tightened into position.