
Finished supports.
This system is cleaner and stronger than the one that was in place

Supports to be replaced
These wooden posts and beams will come out and replaced with our system

old wood supports
This is thee poorest attempt at supporting a floor that I have ever seen. the posts are just sitting on the floor. The supporting beam is just a single piece of wood laying in the side.

hole for footing
First thing is to dig a 2x2x2 hole for the engineered fill.

Engineered fill
The fill creates a bulb of influence which will distribute the weight within the entire pit of gravel

Jacks and beam are in place
Once the post are installed and adjusted, the floor an be replaced

Floor is restored.
Once the posts are adjusted, the floor is restored.