
Opening the floor
We first open the floor to install the liner. The line is 20" in diameter and we make a hole approx. 24" in diameter

Liner set in place
the Liner is set in place and gravel is put around for drainage.

Discharge line
A discharge line is plumbed to the outside.

discharge with Iceguard.
A discharge carries the water away from the home. The Iceguard protects the line from freezing.

Floor is refinished
The pump is installed along with the alarm and the floor is re-concreted back again.