Trench for Waterguard
A trench is opened up and Waterguard is set in place.
Supersump installed
A hole that is 2 feet in diameter and two feet deep is opened up and a Supersump is set in place.
Inpsection ports
These ports are put into the system so that it can be inspected and if needed the system can be flushed.
Floor restored
The wall membrane is installed and the floor is restored back to original height.
Discharge line buried
The discharge line is buried away from he house and is terminates at the Lawnscape outlet.