Finished wall
The wall membrane is added and the drainage system is connected tot he sump so the floor can be restored to the original height
Trench is developed
The first step is to open the floor up at the floor/wall joibt.
Wall membrane added
The wall membrane is mechanically fstened tot he wall and will serve as a moisture barrier.
Sump pit added
The pit for the incredible SuperSump is added and the drainage system is plumbed in.
Interior drain tile is added.
In the trench at the floor/wall joint, the patented drainage system is added.
Floor ready to be closed
Once the drainage system is in place, the floor can be restored.
SuperSump
The incredible Zoeeler submersed pump is installed and the floor is restoredd.
Discharge with IceGuard
The discharge is installed to keep water away from the home along with the patented IceGuard which prevents the line from freezing.