Install sump liner
The first step is to dig a hole and install the perforated sump liner or pit.
Install pump and discharge line
Before the concrete is replaced, the lid, pumps and discharge line is installed
Service log & owners manual
A service log i& owner's manual s attached to the discharge tube so it can be easily seen.
IceGuard discharge line
The patented Iceguard is inserted in the discharge line to stop from freezing
Concrete is troweled on
Fresh concrete around the sump is applied. This is level with the original floor.