Sump Liner
THE floor is opened up and the sump liner is set in place. it is important to install the liner so that the lid is flush with the floor.
Feedline with floor drain.
The floor is opened up to the middle of the room and a perforated line is added which drains to the sump.
Airtight lid
The lid is installed which is airtight and also has an air tight floor drain and an alarm.
Discharge pipe
A discharge pipe is added up through the joist cavity.
image.jpeg
Battery back-up
A DC battery back-up system is added called the UltraSump4
image.jpeg
image.jpeg
IceGuard
An IceGuard is added in the discharge to prevent the discharge from freezing.