Mainline Back Water valve
The Mainline valve is installed where hte main stack for sewage goes out to the city sewage system.
Trench opened
A trench is opened up to installed the patented drainage system.
Waterguard installed
The WaterGuard is installed along with the Cleanspace wall membrane.
SuperSump Plus
The liner for the Supersump plus is installed.
Feedline
Here you can see the feedline from the Backwater Valve tot he sump as added protection.
Discharge Line
An Iceguard is installed to protect the discharge line from freezing.
Floor restored
Fresh concrete is troweled to restore the floor.
Battery back-up
A battery back-up is installed for added protection against power outage or sump failure.