Bowing wall
After the Team removed the finished wall, they noticed some horizontal cracking.
Preparation
The wall is prepared by grinding all of the paint of the wall. This is done for adhesion.
Armor Lock
The Armor locks are installed by drilling plates into the joist header then attaching a strap.
armor lock plate
The plate is attached and the Carbon fiber strap is passed through and adhered to the wall.
Carbon Armor
The Carbon Armor straps are adhered to the wall with epoxy. Also the bottom 5 courses of blocks are solidified by filling the cavities with grout.