SuperSump liner
The floor is opened up and the super sump is installed to disrupt the weeping system from the floor drain.
Back-water valve
is installed in the main sewage trunk. This will rpevent a sewer back up from the city system.
Finished sump
The liner is concreted flush with he floor and the discharge liner is installed. notice the 45 degree elbows. this helps with flow.
floor finished
The concrete is restored back to original height
IceGuard
The Iceguard on the discharge line protects the discharge line from freezing.