Engineered base
A 2x2x2 foot base is dug out
Engineered fill
The cube is filled with gravel and compacted to develop the bulb of influence
jacks are installed and adjusted
a steel plate is placed on the gravel that is 1foot square.
Floor refinished
Once everything is installed the floor is re-concreted.

