Weeping the blocks
Andrew drills holes into the bottom blocks to allow the water to escape from the cavities.
Trench is prepared
The trench is opened up to install Waterguard. some preparation is required to adjust the slope.
WaterGuard is capped
The end of the Waterguard is capped to make sure the water drains in the right direction
image.jpeg
Half height wall membrane.
It is imporatnt to put wall membrane up 4' or above frost line. On a poured concrtete wall, it is necessary to attach the wall membrane up to the top of the wall in case a future crack develops.
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
Floor is restored
One of the final steps before clean-up is to re-concrete the trench back to original floor height.