Sump install
it is important to find the right spot for the sump. it is also important to make sure that the sump is flush with the floor.
WaterGuard
Our patented waterguard is installed beneath the floor
image.jpeg
image.jpeg
image.jpeg
Discharge beside WaterGuard
If you look close, you can see the black ABS pipe beside our WaterGUard which will serve as the discharge pipe to take the water to outside.
image.jpeg
image.jpeg
image.jpeg
image.jpeg
Carbon Fiber stitches.
Where is cracking in the blocks, Carbon Arbon stitches are epoxied to add support
image.jpeg
fresh concrete
Once the waterproofing system is in place the floor can be restored
Behind water heater
The customer arranged to have the waterheater moved out the day before we showed up. then we waterproofed in this area on the first day so that the waterheater can be moved back again.
Work around
We are very good at working around obstacles
bathroom waterproofing
We needed to remove the shower but we did not have to remove the toilet.
Half wall membrane
On blocks foundations, we can do a half wall membrane because the water goes to the bottom of the wall cavities inside the blocks
behind stairs
we would rather not remove the stairs if we don't have to. In this case, we were able to work behind the stairs
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
image.jpeg
IceGuard
The discharge includes our patented IceGuard to prevent frozen discharge